Problem
Homeowner needed reliable Level 2 charging but the detached garage had only general lighting power fed from the main house.
Site conditions
- Detached garage with existing conduit path and limited interior wall space
- Main panel inside the house with modest spare capacity
- Cold-weather exposure requiring appropriate outdoor-rated equipment
Diagnosis
Load calculation confirmed capacity for a 40A EV circuit. Existing conduit was adequate for new conductors with proper derating and terminations.
